Invention Diary #13: What We Need to Learn From Metal Prototypes

Conceptual engineering notebook, caliper, and generic metal samples beside the title Learning From Metal Prototypes.

INVENTION DIARY · ENTRY 13

This week’s work has taken us back into the CAD and into the details of a proposed engineering engagement. Both are part of preparing for useful metal prototypes: deciding what to build, what needs checking first, and what work an outside developer would undertake.

Project update: November 13, 2026.


Starting With What We Have Checked

We have printed and assembled V35 and verified its fit and mechanical operation. In Entry #11, we described the engineering and fabrication conversations helping us work toward a small metal prototype batch.

That printed reference gives us something concrete to discuss. Its unheated checks do not establish the heated performance, durability, or manufacturing consistency of a metal version. Those remain questions for further engineering review and evaluation.

Revisiting an Earlier Version

Our development work does not always move in a straight line through version numbers. We have returned to an earlier CAD version as the starting point for exploring a further revision. That lets us reconsider one part of the design while drawing on what we have learned from later work.

This is design work in progress. The revised arrangement still needs physical fit and operation checks. The verification we previously reported for V35 applies to that printed version; it does not automatically carry over to a new revision.

Agreeing on the Build

Before committing to fabrication, we want a clear understanding of the complete assembly, any CAD changes, material choices, finishing, and the work included in the proposed scope. Quantity, cost, and lead time need to be clear as well.

We are considering stainless steel, including 316L, and seeking recommendations on suitable materials and manufacturing methods. Those choices need to be assessed for the intended conditions of use and cleaning. We have not announced a final production specification.

We are also reviewing the terms of a proposed outside engineering engagement, including the scope of its deliverables and the treatment of our existing intellectual property and any new work. We have requested corrections and are continuing that review before proceeding with the engagement.

For us—Greg and Gayla—getting those expectations clear is part of the development work. A proposal for an engineering assessment is a step toward deciding what to do next; the assessment, any resulting CAD changes, and fabrication are separate stages.

Preserving the Intended Functions

A fabrication proposal may suggest changes that make a part easier to produce. We need to understand how those changes affect the assembled device and the functions we have been developing.

The next build should give us a useful basis for checking assembly, operation, and maintenance. Where a proposed change significantly alters an interface or how parts work together, another unheated fit check may be a useful step before committing to metal. Detailed mechanisms remain within our engineering and patent discussions.

Defining a Useful Evaluation

We want the evaluation to address practical questions: Do the parts assemble consistently? Does the device operate as intended? Can it be taken apart and maintained without unnecessary difficulty? What changes with repeated use and cleaning?

Material suitability and the behavior of the complete assembly under anticipated conditions also need appropriate review. A successful fit check is one part of that work.

We intend to keep the version, materials, and observations associated with each prototype clear. That will help us compare results and avoid confusing feedback from earlier working devices with findings about a new build.

Learning Before Ordering More

A small batch gives us an opportunity to examine the next design before making a larger manufacturing commitment. The value will be in identifying what is repeatable, what needs refinement, and which questions remain unanswered.

Our immediate priorities are to check the CAD revision physically, resolve the proposed engagement’s scope and ownership terms, and decide on the next fabrication step. We will share the results of those checks and subsequent build milestones as they occur.

Continuing the Build

VetVention continues to assist us with the project. Our Mission page explains that connection, and the Founding Tester Program provides a way to express interest in future participation.

We look forward to sharing what the next prototypes teach us. For now, defining the build and its evaluation is an important part of moving SnuffRing forward.

Follow the build

Subscribe here for new diary entries, prototype progress, and launch updates.

You can unsubscribe at any time. Read our Privacy Policy.

Explore the Invention Diary →

Leave a Reply